Butyl tape Construction regulations
Dec 20, 2017

Construction regulations


(1) Construction is required at a temperature range of -15 ° C to 45 ° C (measures taken in excess of the specified temperature range)


(2) grass-roots surface must be cleaned or wiped clean, dry, no floating soil, oil.


(3) Within 24 hours after construction, the bond should not be torn or peeled off.


(4) According to the actual project needs to choose different models, size specifications .


(5) placed about 10cm from the ground on the box, do not stack more than 5 boxes.


Construction tools


Cleaning tools, scissors, pressure Kun, wallpaper knife and so on.


Requirements


(1) adhesive base clean oil-free gray water, water vapor.


(2) In order to ensure the bonding strength of the base surface temperature above 5 ° C, the specific low-temperature environment can be special production.


(3) When used, anti-peeled tape can be used after a lap.


(4) Do not use with benzene, toluene, methanol, ethylene, silicone and other organic material containing waterproof material at the same time.


Folding process characteristics


(1) Construction convenient and quick. Yongxing adhesive tape construction should be a bond in place, grass-roots surface clean.


(2) Wide construction environment requirements. Ambient temperature at -15 ° C-45 ° C, humidity below 80 ° C can be normal construction, with strong environmental adaptability.


(3) repair process is simple and reliable. Only large leaks can be single-sided tape.


Products List