Before the 1950’s building façade sealants did not exist.  Building joints were sealed with oil based caulks, which provided protection from the effect of weathering.  The development of new sealant technology and flexible rubber sealants opened the door to non-masonry, high thermal movement building exteriors (like aluminum), and façade curtainwall (curtainwalls are defined as nonload bearing walls that are attached to floor lines and columns only) construction.

These lightweight walls heat and cool rapidly thus creating a high stress environment which will take its toll on exterior building sealants.  The characteristically high movement in curtainwall structures makes it necessary to design appropriate joints and use a sealant with good movement capability.

The first sealants were based on polysulphide polymers.They were followed by acrylic, silicone and polyurethane sealants.  Each has its own unique properties causing them to perform differently under varying conditions.The differing strengths and weaknesses demand varying surface preparation techniques and uses.  A thorough understanding of all these materials by the sealant contractor is necessary to ensure that the most effective sealant is specified for and applied to a particular project.

Building Façade Sealant Repairs & Replacement

Since sealants do not have an indefinite life span, they eventually need to be replaced.  Prior to actual replacement it is important to determine what happened to require replacement.  If joint failure has occurred, the cause should be determined to prevent a reoccurrence of the problem.

There are four basic types of joint failure:

1.Adhesive failure- The sealant has separated cleanly from the surface of the substrate.

2.Cohesive failure- When a sealant tears within itself, it has failed cohesively.

3.Substrate failure- When the substrate material ruptures or delaminates at or below the bond line.

4.Loss of sealant properties- The useful life of a sealant is dependent upon the quality of the workmanship during installation and the actual sealant properties as compared to the manufacturers written statements.

There are two common approaches to joint sealant restoration: complete removal and replacement or use of a “bridge joint”. Complete removal is defined as the removal of all traces of sealant, because any remaining sealant could deter proper adhesion of the new sealant.  An overlay joint repair or “bridge joint” allows the new sealant to bridge over the existing sealant from the face of one side of the joint to the other without adhering in the center.

 